In heavy industry it is not the individual drawing that decides the outcome, but whether the sheer volume stays manageable: thousands of measuring points, hundreds of control cabinets, documentation grown over decades. And a shutdown window that is not negotiable.

View into a blast furnace plant with platforms, pipework and a row of control cabinets

Typical tasks

  • Migrating a control system generation while production planning continues.
  • Recording the actual state at the plant itself.
  • Consistent labelling systematics across all parts of the plant.
  • Dismantling, rebuilding and commissioning within a fixed time window.
  • Robust design for heat, dust and mechanical load.

What we take on

  • Circuit, wiring and terminal diagrams for migration and rebuild.
  • Structuring and continuing plant documentation grown over years.
  • Technical project responsibility throughout the preparation phase.
  • Project teams on site during the shutdown.

Engineering software & CAE systems

We work inside your system landscape.

For electrical design and technical documentation we use established CAE systems. Which one we use follows your standards and your existing environment – not our habit.

  • EPLAN Electric P8

    Electrical design & schematics

    • Circuit diagrams
    • PLC & I/O
    • Terminals & cables
    • Reports
  • ELCAD

    Electrical engineering & technical documentation

    • Circuit diagrams
    • Existing plants
    • Revisions
    • Plant documentation

Technical framework

Preparation decides the outcome, not the shutdown itself. On projects of this scale, the majority of the work happens before day one of implementation.

A project from this industry

Modernisation of one of Europe's largest blast furnaces

System migration of a plant with 11,000 measuring points in just 120 days – under extreme time pressure and alongside ongoing production planning.

11,000
Measuring points
850
Drives
220+
Control cabinets
120
Days to completion

Learn more

Plants and segments in this industry

  • Steel industry and smelting works
  • Rolling mills
  • Foundries
  • Metal processing
  • Aluminium industry
  • Forges
  • Surface technology and electroplating

Contact

Tell us what it is about.

A phone call or three lines is enough. From the very start you talk to the people who will later work on your project – not to a distribution list.

Your contact

Portrait of Olaf Kreith

Olaf Kreith

Head of Sales · Braunschweig

Head office switchboard

Locations

Head officeStellmacherstr. 7
33428 Marienfeld (Harsewinkel)
Gütersloh officeWagenfeldstr. 2
33332 Gütersloh

Or write to us

We usually reply within one working day.

Go to the contact form