Services

Our services are grouped by what they do in a project, from a single schematic through article master data, standardisation and 3D cabinet design to the ongoing care of complete plant documentation. Individually or as continuous support.

Systems

We work in your system.

The plant stays in the environment in which it is documented. We adapt to your standard, not the other way round.

A process plant with columns, pipe bridges and vessels.

Process

How a project runs with us.

Four steps, from the first look at the documents to the handover in your system environment.

  1. RecordingWe review the existing documents and clarify which standard applies, which template is used and where the installed base differs from the documentation. For existing plants that includes a site visit.
  2. AgreementLabelling systematics, page structure, article master data and file structure are agreed and written down before the first page is drawn.
  3. DesignWork runs in review cycles. Interim states go to you before an error propagates across a hundred pages.
  4. HandoverYou receive the project in your system environment, with reports and in the agreed structure. On request we take over maintenance afterwards.
Meeting room with a long table and a wall-mounted screen, ornamental grasses in the foreground

Training

EPLAN workshops & training

Practice-oriented workshops on your own projects, not on exercises from a training folder.

  • EPLAN Electric P8 in practice
  • Building system structures and standards
  • Macros, article databases, component libraries
  • Reports, cross-references and project templates

Frequently asked

What prospects often ask

You have a technical task? We will look at how it can be solved.

Discuss a project
What does an electrical designer do?

Electrical designers plan the electrical equipment of machines and plants. They select devices, size cables and protective devices, create circuit, terminal and cable diagrams in the CAE system and make sure that bills of materials and documentation match the plant as built.

Is it a problem that our drawings are outdated?

It is the normal case, and exactly why every retrofit starts with the as-is survey. Reconciling drawings and plant is part of the service, not your prerequisite.

How do you estimate effort when the state is unclear?

You do not, which is why every such project starts with a bounded survey. That is calculable and provides the basis for everything else. Anyone quoting a total beforehand is guessing.

Do you also work on site at the customer?

Yes. Projects run partly remotely, partly on site. Where needed we build project teams directly at your location. What makes sense depends on project and infrastructure, and we clarify that at the start.

Do you also take on project management?

Technical responsibility yes, commercial project management no. We judge whether a solution holds technically and whether the documents are correct. Schedule, budget and contract stay with you.

How long does such a change take?

Analysis and system configuration are doable within a few weeks. The module structure, by contrast, grows with the projects. Realistically, the first noticeable effects come after two or three projects, not after two weeks.

Contact

Tell us what it is about.

A phone call or three lines is enough. From the very start you talk to the people who will later work on your project, not to a distribution list.

Direct

Or write to us

We usually reply within one working day.

We only use your details to answer your enquiry. More in our privacy policy.

Go to the contact form

Olaf Kreith

Your contactOlaf KreithHead of Sales

Quick question

Do you need help or have any questions?

Tell us briefly what it is about. We usually reply within one working day.