
Services
Article master data & macros
Nobody enjoys maintaining article master data. It is invisible, it appears in no project calculation, and it costs the most time exactly when you have the least, in the middle of a project. That is precisely why outsourcing this work pays off.
When this service is needed
- The article base has grown over years and contains duplicates and legacy records.
- Identical plant sections are redrawn on every project.
- Manufacturer data is to be adopted but checked first.
- The design office should focus on design, not on data maintenance.
Result
- Maintained article database in your system environment
- Macro library for recurring plant sections
- Written rules for naming and classification
- Overview of cleaned and merged records
We take on the electrical design there is no time for in house.
- Electrical design
- Since 1998
- Employees
- 15
- CAE systems (EPLAN, WSCAD, ELCAD)
- 3
- Projects since 1998
- 2,300+
Why FISEKON
One contact, not a distribution list
Whoever takes your project also works on it.
Your CAE system, not ours
EPLAN, WSCAD or ELCAD, using your part master.
Existing plants are our everyday work
Plant runs, documents do not match. That is where we start.
Capacity without a permanent post
Design capacity when you need it.
Process
How we work together
Review
We look at the existing base. How many articles are there, how many are actually in use, how consistently are they set up?
Rules
Naming, classification and mandatory fields are agreed. Without these rules the same mess reappears within six months.
Build
Articles and macros are created or cleaned up, prioritised by what is actually used day to day.
Maintenance
New articles and changes are kept up continuously. On request under a maintenance agreement with a fixed scope.
We build and maintain the data foundation your design office works from. That covers article master data with complete technical attributes, component libraries, and product and window macros for recurring plant sections.
The effect does not show on the first project but on the second. A cleanly built macro saves the same time again on every reuse. A poorly maintained article base costs it again just as reliably. So this is less about volume than about structure, meaning consistent naming, rigorous function definitions and maintained accessory assignment.
We create new articles and rework grown data alike, including the thankless task of finding duplicates, retiring obsolete records and checking manufacturer data instead of importing it unseen.
Where suppliers deliver data, we check it before adoption. An imported article base is not data maintenance but a building site with a delay built in.
Frequently asked
Article data & macros
You have a technical task? We will look at how it can be solved.
Discuss a projectIs this worthwhile for smaller design teams?
Usually yes, but for a different reason. For small teams it is less about scale than about resilience. If knowledge of the article base sits with one person, documented rules are worth more than any time saving.
Do you take data directly from manufacturers?
Where available, yes, but checked. Manufacturer records vary in quality, and an unchecked import brings back exactly the inconsistency you wanted to remove.
What happens to our legacy data?
Nothing is deleted silently. We flag what should be retired and you decide. Cleanup only happens after your approval.
Related services
- Standardisation & methodologyProcess analysis, system configuration and modular design methodology turn recurring work into a standard.
- Schematic generationFor plants where variants repeat rather than differ, configuration data becomes finished schematics.
- Electrical designPlanning and implementation of electrical designs for industrial plants, from new projects to the integration of existing systems.
Contact
Tell us what it is about.
A phone call or three lines is enough. From the very start you talk to the people who will later work on your project, not to a distribution list.
Direct
- Phone+49 (0) 5247 4070-66
- Emailinfo@fisekon.com
- AvailabilityMon to Fri, 8 am to 5 pm CET
Or write to us
We usually reply within one working day.