FISEKON GmbH – Fischer Elektrokonstruktion

Downloads

Documents to take with you, without a form in front of them. We think trading technical information for an email address is the wrong deal.

No registration. No form, no email required.

  • Quick reference

    IEC 81346-2 letter codes as CSV

    The common letter codes with meaning and examples, for import into Excel, EPLAN or your own article database.

    CSV · 2 kB · Updated 2026-08-10

    Download

  • Checklist

    Plant documentation checklist

    What a handover-ready plant documentation has to contain, from labelling systematics to revision control.

    In preparation

    This document has not been published yet.

    Get notified

  • White paper

    White paper: system migration within a shutdown window

    How a control system migration is prepared so that it fits a fixed time window.

    In preparation

    This document has not been published yet.

    Get notified

Newsletter on electrical design

When there is something new that genuinely helps.

We write when a new tool is ready, an article is published or something changes in a relevant standard. Not more often. No sales in the mailing list.

  • About four to six issues a year.
  • Unsubscribe any time with one click.

The newsletter starts shortly

Sign-up is not open yet. Until then you will find new articles and tools here on the site.

Contact

Tell us what it is about.

A phone call or three lines is enough. From the very start you talk to the people who will later work on your project, not to a distribution list.

Direct

Locations

Registered office and postal addressStellmacherstr. 7
33428 Marienfeld (Harsewinkel)
Gütersloh officeWagenfeldstr. 2
33332 Gütersloh

Or write to us

We usually reply within one working day.

Write email

Opens your email program with the message already written. Read it, change whatever you like, and send it yourself — from your mailbox to ours.

Go to the contact form