Latest article9 November 20266 min read

Articles
Notes from ongoing work, on questions we meet regularly in projects. No product announcements, no industry news.
28 October 20263 min read
AI in electrical design. Hand over the work, keep the thinking
21 October 20263 min read
Initial symmetrical or peak short-circuit current?
16 October 20264 min read
Outsourcing electrical design. How to recognise a good service provider
15 October 20264 min read
ELCAD or EPLAN? When switching pays off and when it does not
15 October 20263 min read
Electrical design for new amusement rides from prototype to series production
15 October 20263 min read
Modernising old cranes and staying inspection-ready
15 October 20263 min read
Modernising a weaving mill while production keeps running
14 October 20264 min read
Basic engineering settles 13 decisions before the schematic
14 October 20263 min read
EPLAN macros and templates. Understand first, then adopt
14 October 20264 min read
Reference designations in EPLAN done right
31 August 20262 min read
What plant documentation is worth when something fails
31 July 20262 min read
In a retrofit, the as-is survey decides, not the spare part
30 June 20262 min read
IEC 81346 designations need a system, not just the standard
31 May 20262 min read
Why cable sizing rarely fails on current
FISEKON newsletter
When there is something new that genuinely helps.
We write when a new calculator is ready, an article on electrical engineering design is published or there is news from the FISEKON world. Not more often.
- About four to six issues a year.
- Unsubscribe any time with one click.
Contact
Tell us what it is about.
A phone call or three lines is enough. From the very start you talk to the people who will later work on your project, not to a distribution list.
Direct
- Phone+49 (0) 5247 4070-66
- Emailinfo@fisekon.com
- AvailabilityMon to Fri, 8 am to 5 pm CET
Or write to us
We usually reply within one working day.