
Services
Standardisation & design methodology
In most design offices the biggest lever is not drawing faster but not drawing the same thing three times. Standardisation is uncomfortable because it costs time up front and saves it only later, which is exactly why it keeps getting postponed.
When this service is needed
- Every project feels like starting from scratch.
- Several ways of working exist side by side, depending on who does it.
- Product lines and variants should be handled without redesigning.
- A new CAE environment is to be introduced and set up properly.
Result
- Documented analysis of the current workflows
- Configured CAE environment with templates and reports
- Module library for recurring functional units
- Written design rulebook
We take on the electrical design there is no time for in house.
- Electrical design
- Since 1998
- Employees
- 15
- CAE systems (EPLAN, WSCAD, ELCAD)
- 3
- Projects since 1998
- 2,300+
Why FISEKON
One contact, not a distribution list
Whoever takes your project also works on it.
Your CAE system, not ours
EPLAN, WSCAD or ELCAD, using your part master.
Existing plants are our everyday work
Plant runs, documents do not match. That is where we start.
Capacity without a permanent post
Design capacity when you need it.
Process
How we work together
Process analysis
We observe the actual work and talk to the designers. What is written down and what is done are rarely the same.
Target picture
Together we decide what gets standardised and what deliberately stays free. Not everything belongs in a standard.
Implementation
System configuration, templates and module structure are built and tried on a real project, not on an example.
Handover
The rules are handed over in writing and introduced to the team. On request we accompany the first projects afterwards.
We look at how your department actually works. Which steps repeat on every project, where is information captured more than once, where do errors regularly arise? From that emerges a picture of what can be standardised and what cannot.
On that basis we set up the system environment, from templates and settings through numbering and reports to the file structure. A well configured EPLAN environment removes a considerable amount of daily manual work without anyone having to change how they think.
The second part is the methodology of modular, reusable schematics. Plant sections are built as self-contained functional units that can be combined, instead of assembling every project from individual pages. That is the step that makes the difference for product lines and variants.
We do not impose a standard on your team. A standard the designers find impractical gets bypassed, and then the situation is worse than before. So it is developed with the people who work with it.
From a project
Automotive supplier
Conveyor system for optimised material flow
Electrical design of a highly automated conveyor system in Bratislava, using our own product macros and a circuit diagram generator.
Industries where we take this on
- Machinery & special-purpose machineryFrom a single machine to series production. Electrical design that can actually be built.
- Automation & roboticsCells, lines and handling systems. Electrical design that is clean throughout.
- Automotive & mobilityTwo worlds. The electrics inside the vehicle and the plants that build it.
- Electronics & battery manufacturingNear-cleanroom production, high cycle rates, young plant generations.
- Packaging & consumer goodsProduction lines whose documentation connects layout plan to fluid diagram.
- Amusement rides & leisure facilitiesNew rides from prototype to series production, for markets worldwide.
Calculators for this service
Frequently asked
Standardisation & methodology
You have a technical task? We will look at how it can be solved.
Discuss a projectHow long does such a change take?
Analysis and system configuration are doable within a few weeks. The module structure, by contrast, grows with the projects. Realistically, the first noticeable effects come after two or three projects, not after two weeks.
Do we have to change our way of working completely?
No, and we advise against it. A complete switch during ongoing project work almost always fails. We start where improvement can be isolated and build out from there.
What if we have to serve several customer standards?
That is the norm in machine building. Then it is not the presentation that gets standardised but the methodology behind it. Module structure and data base stay the same, only the output follows the respective customer template.
Related services
- Article data & macrosBuilding and maintaining article databases, component libraries and macros. Every later design is built on that data foundation.
- Schematic generationFor plants where variants repeat rather than differ, configuration data becomes finished schematics.
- EPLAN workshopsPractice-oriented workshops on your own projects, not on exercises from a training folder.
Contact
Tell us what it is about.
A phone call or three lines is enough. From the very start you talk to the people who will later work on your project, not to a distribution list.
Direct
- Phone+49 (0) 5247 4070-66
- Emailinfo@fisekon.com
- AvailabilityMon to Fri, 8 am to 5 pm CET
Or write to us
We usually reply within one working day.
