FISEKON GmbH · Fischer Elektrokonstruktion

Cleanroom production with process vessels, a vial filling line and a robot arm behind glass.

Services

Technical documentation & revisions

Plant documentation ages faster than it is maintained. After the third rebuild without feeding changes back, a drawing is not merely wrong. It is unusable. And nobody notices that in normal operation, only during a fault at three in the morning.

When this service is needed

  • Documents come from several expansion stages and no longer fit together.
  • After a rebuild, changes were never fed back into the as-built.
  • A plant is being taken over and the state of its documentation is unclear.
  • An inspection or acceptance is due and the evidence is missing.

Result

  • Reconciled plant documentation in the target system
  • Documented labelling systematics
  • Device, cable and instrument lists
  • Revision states with a traceable change history

Request a project

We take on the electrical design there is no time for in house.

Electrical design
Since 1998
Employees
15
CAE systems (EPLAN, WSCAD, ELCAD)
3
Projects since 1998
2,300+

Why FISEKON

  1. One contact, not a distribution list

    Whoever takes your project also works on it.

  2. Your CAE system, not ours

    EPLAN, WSCAD or ELCAD, using your part master.

  3. Existing plants are our everyday work

    Plant runs, documents do not match. That is where we start.

  4. Capacity without a permanent post

    Design capacity when you need it.

Process

How we work together

  1. Survey

    We compare documentation and plant and record the deviations. The result is a reliable statement of what is missing and what the rest will cost.

  2. Agree the structure

    Labelling, structure and filing are agreed. Where a grown system exists, we continue it.

  3. Reworking

    Documents are completed, corrected and transferred into the target structure, section by section, so operation can continue.

  4. Keeping it current

    So the state does not drift again, we agree who enters changes in future. On request we take that on permanently.

We bring existing documents up to date in a structured, traceable and revision-proof form and keep them there. That includes recording the actual state as well as feeding changes cleanly back into the as-built.

The first step is almost always an honest survey. How far does the documentation deviate from the plant? Which expansion stages made it in, which did not? Only once that is clear can effort be estimated seriously. Before that, any figure is a guess.

Then comes structure. Plant documentation is only worth something when maintenance staff, contractors and your own design office all find the same thing in it. Labelling, plant structure and filing decide that, not the number of pages.

We explicitly take on the unglamorous parts too. We maintain instrument lists, keep the labelling system consistent and record the changes nobody enjoys entering. That is exactly where documentation otherwise fails.

From a project

Household appliances

Modernisation of a dishwasher production line

A new automation strategy for a production line, with consistently linked documentation from the factory layout through to the fluid plan.

Frequently asked

Technical documentation & revisions

You have a technical task? We will look at how it can be solved.

Discuss a project
How do you estimate effort when the state is unclear?

You do not, which is why every such project starts with a bounded survey. That is calculable and provides the basis for everything else. Anyone quoting a total beforehand is guessing.

Does the plant have to shut down for this?

Usually not. Recording happens during operation, and the reworking happens at the desk anyway. Only individual checks need an agreed time slot.

Can you take over paper archives?

Yes. Paper and scans are the norm for older plants. How that becomes a maintained CAE project is described under legacy drawing digitisation.

Contact

Tell us what it is about.

A phone call or three lines is enough. From the very start you talk to the people who will later work on your project, not to a distribution list.

Direct

Or write to us

We usually reply within one working day.

We only use your details to answer your enquiry. More in our privacy policy.

Go to the contact form

Olaf Kreith

Your contactOlaf KreithHead of Sales

Quick question

Do you need help or have any questions?

Tell us briefly what it is about. We usually reply within one working day.