Short-circuit current at the transformer

The short-circuit current determines the breaking capacity the downstream protective devices need. For a first estimate, three figures from the transformer nameplate are enough.

Input

As stated on the nameplate.

Result

Short-circuit current at the terminals
kA
Rated current
A
Ratio Iₖ / Iᵣ

A guide, not a design to standard. The applicable standards and case-by-case verification govern.

Worked example

The default case the calculator starts with, worked through once. Change the values above and it recalculates immediately.

Inputs

Rated apparent power
630 kVA
Nominal voltage, low-voltage side
400 V
Short-circuit voltage uₖ
6 %

Result

Short-circuit current at the terminals
15.2 kA
Rated current
909 A
Ratio Iₖ / Iᵣ
16.7

Formula

  • Iᵣ = Sᵣ / (√3 · Uᵣ)
  • Iₖ = Iᵣ / (uₖ / 100)

Assumptions and standards

  • The calculation assumes an infinitely strong upstream source – the real network limits the current further, so the result is on the safe side.
  • Only the transformer is considered, not cables, busbars or motor contribution.
  • A binding design requires calculation to IEC 60909.

Frequently asked

Why is the value higher than in the network study?

Because the upstream network impedance is neglected here. In practice it reduces the short-circuit current, often by 5 to 15 %. For selecting breaking capacity, erring high is the right direction.

What does uk on the nameplate mean?

The voltage that has to be applied on the high-voltage side so that rated current flows on the low-voltage side under short circuit – given as a percentage of nominal voltage. A small uk means a high short-circuit current.

Calculating is the easy part.

A formula gives you a number. Designing a plant also demands installation method, grouping, discrimination, the standards in force and a look at the installed base. That is what we take on.

Request a project

Contact

Tell us what it is about.

A phone call or three lines is enough. From the very start you talk to the people who will later work on your project – not to a distribution list.

Direct

Locations

Head officeStellmacherstr. 7
33428 Marienfeld (Harsewinkel)
Gütersloh officeWagenfeldstr. 2
33332 Gütersloh

Or write to us

We usually reply within one working day.

Go to the contact form