FISEKON GmbH – Fischer Elektrokonstruktion

08 — Tools

Build a reference designation to IEC 81346

Labelling is what plant documentation stands or falls on in the long run. Anyone looking for a component ten years later finds it through the designation – or not at all. This builder shows the structure and the common letter codes.

Input

What the unit does – the functional assignment.

Where it is installed – the mounting location.

Letter code to IEC 81346-2.

0 omits the terminal.

Result

Complete reference designation
Structure

A guide, not a design to standard. The applicable standards and case-by-case verification govern.

Worked example

The default case the calculator starts with, worked through once. Change the values above and it recalculates immediately.

Inputs

Function (=)
=A1 – plant section 1
Location (+)
+S1 – control cabinet 1
Component (−)
−Q – switching energy (contactor, breaker)
Sequential number
12
Terminal (:)
0

Result

Complete reference designation
=A1+S1-Q12
Structure
= function · + location · − component with letter code and number · : terminal

Formula

  • =Function +Location −Component :Terminal
  • Example: =A1+S1-Q12:14
  • = functional assignment · + mounting location · − product · : terminal

Assumptions and standards

  • Letter codes to IEC 81346-2 (formerly EN 61346-2 and before that DIN 40719).
  • The prefixes are standardised, the numbering behind them is not – it follows the operator’s system. That is exactly why an agreed system matters so much.
  • This builder shows the most common letter codes, not the complete table from the standard.

Frequently asked

What is the difference between = and +?

The equals sign describes function – what a component belongs to. The plus sign describes location – where it is installed. A contactor can belong functionally to the conveyor line (=F1) while sitting in control cabinet 2 (+S2).

Do I have to use every level?

No. In small installations the product level alone (−Q12) is often enough. As soon as there are several cabinets or plant sections, adding location and function quickly becomes indispensable.

We have our own grown system. Should we switch?

Usually not. A consistently applied in-house system beats a half-converted installed base. In projects we continue existing systems rather than replacing them – a break in the documentation costs more than the standard gains.

Calculating is the easy part.

A formula gives you a number. Designing a plant also demands installation method, grouping, discrimination, the standards in force and a look at the installed base. That is what we take on.

Request a project

Contact

Tell us what it is about.

A phone call or three lines is enough. From the very start you talk to the people who will later work on your project – not to a distribution list.

Direct

Locations

Head officeStellmacherstr. 7
33428 Marienfeld (Harsewinkel)
Gütersloh officeWagenfeldstr. 2
33332 Gütersloh

Or write to us

We usually reply within one working day.

Go to the contact form