What plant documentation is worth when something fails

In normal operation an outdated set of drawings goes unnoticed. It gets noticed exactly when nobody has time to read it.

2 min read

In this article
  1. Documentation does not fall behind, it seeps away
  2. What ongoing maintenance means in practice
  3. The measure is not the page count

Friday, just before the shift change. Part of the plant fails. The technicians are on site quickly. But what begins is not fault-finding but a search for how things are actually wired. The drawings are incomplete, changes were added by hand over the years or not documented at all. The plant is down, the pressure rises, and nobody can rely on the sheet in their hand showing reality.

Documentation does not fall behind, it seeps away

Hardly any documentation goes out of date in one large step. It goes out of date in many small ones. A terminal is added, a drive replaced, an address changed. Each individual change is too small to justify raising a job. That is exactly why it is left undone. After two years there are fifty such small things, and the actual state can no longer be reconstructed from memory.

None of this ever shows in normal operation. It shows during a fault, when the documentation is genuinely needed for the first time in months.

And not only then. Periodic testing of electrical installations under DGUV Vorschrift 3, the German accident-insurance rule, assumes the person testing knows the intended state, and the German Ordinance on Industrial Safety (BetrSichV) requires a risk assessment for work equipment that rests on those same documents. A drawing set that no longer reflects the plant is therefore more than inconvenient.

What ongoing maintenance means in practice

The difference is not the care taken when incorporating a change. That is the same either way. It is whether there is a route for getting a change off your desk at all, without setting up a project for it.

In practice, you report the change in whatever legible form suits you, be it a photo of the red-pen markup, a note or a sketch. It is then incorporated properly into the CAE project, with a traceable revision status in the title block. The data fields that belong there are specified in ISO 7200. And the current state sits where somebody will find it during a fault, rather than in a mailbox.

The measure is not the page count

Documentation is not good when it is complete. It is good when a maintenance technician facing a fault can find what they are looking for without prior knowledge. That takes a state that reflects the plant and a labelling system nobody has to decode first.

Neither is busywork for quiet days. It is preparation for the Friday afternoon when it matters.

Carsten FischerWritten by Carsten Fischer, Management

FISEKON newsletter

When there is something new that genuinely helps.

We write when a new calculator is ready, an article on electrical engineering design is published or there is news from the FISEKON world. Not more often.

  • About four to six issues a year.
  • Unsubscribe any time with one click.

After submitting you will receive an email with a confirmation link. Only then are you subscribed. This ensures nobody can enter someone else’s address.

Unsubscribe from newsletter

Contact

Tell us what it is about.

A phone call or three lines is enough. From the very start you talk to the people who will later work on your project, not to a distribution list.

Direct

Or write to us

We usually reply within one working day.

We only use your details to answer your enquiry. More in our privacy policy.

Go to the contact form

Olaf Kreith

Your contactOlaf KreithHead of Sales

Quick question

Do you need help or have any questions?

Tell us briefly what it is about. We usually reply within one working day.